:
: contact@londontraininginstitute.co.uk
: (+44) 0203 617 1437 | Contact Us | Corporate Training | Blog
Home

CCNP Training

CCNP Training London | Cisco Courses London(UK) | Networking courses london

CISCO - CCNP

Full Time 5 Days (09:00 - 17:00)

Weekend Batch 6 weekends (Sat 10:00 - 18:00)

Evening Batch 2 weeks (Mon-Fri 18:30 - 21:30)

Starts On:
January 16, 2017
9:00 AM
Ends On:
January 27, 2017
5:00 PM
Contact Support

CCNP Certification Training course covers planning, implementation and troubleshooting of local and wide area enterprise networks. Students who wishes to follow the CCNP training we highly recommend them with at least one year of experience in networking field or having previously competed CCNA training. At the end of the training student will demonstrate the knowledge and skills that required in enterprise environment and can apply for the following roles such as system/network engineer, support engineer, network technician.

This instructional class is also principally expected to help applicants attain their CCNP certificate, which obliges a beforehand got CCNA certification. This instructional class will likewise profit understudies looking to assemble and learn their insight into how to outline and implement medium-size systems with 100 to 500 or more workstation, and as a step towards accomplishing the CCIE Routing & Switching accreditation.

EIGRP based solution, network design and a set of requirements

  • Network resources needed for implementing EIGRP on a network
  • Create an EIGRP implementation plan, EIGRP verification plan
  • Configure EIGRP routing
  • Verify EIGRP solution was implemented, Use show and debug commands
  • Document results of EIGRP implementation and verification

 

Multi-area OSPF Network, given a network design and a set of requirements

  • Determine network resources needed for implementing OSPF on a network
  • Create an OSPF implementation plan, OSPF verification plan
  • Configure OSPF routing
  • Verify OSPF solution was implemented properly using show and debug commands
  • Document results of OSPF implementation and verification plan

 

eBGP based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing eBGP on a network
  • Create an eBGP implementation plan
  • Create an eBGP verification plan
  • Configure eBGP routing
  • Verify eBGP solution was implemented properly using show and debug commands
  • Document results of eBGP implementation and verification plan

 

IPv6 based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing IPv6 on a network
  • Create an IPv6 implementation plan, IPv6 verification plan
  • Configure IPv6 routing
  • Configure IPv6 interoperation with IPv4
  • Verify IPv6 solution was implemented properly using show and debug commands
  • Document results of IPv6 implementation and verification plan

 

IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements

  • Create a redistribution implementation plan based upon the results of the redistribution analysis
  • Create a redistribution verification plan
  • Configure a redistribution solution
  • Verify that redistribution was implemented
  • Document results of a redistribution implementation and verification plan
  • Identify the differences between implementing an IPv4 and IPv6 redistribution solution

 

Layer 3 Path Control Solution

  • Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
  • Create a Layer 3 path control verification plan
  • Configure Layer 3 path control
  • Verify that a Layer 3 path control was implemented
  • Document results of a Layer 3 path control implementation and verification plan
  • Implement basic teleworker and branch services
  • Describe broadband technologies
  • Configure basic broadband connections
  • Describe basic VPN technologies
  • Configure GRE
  • Describe branch access technologies

 

Implement VLAN based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a VLAN based solution on a network
  • Create a VLAN based implementation plan
  • Create a VLAN based verification plan
  • Configure switch-to-switch connectivity for the VLAN based solution
  • Configure loop prevention for the VLAN based solution
  • Configure Access Ports for the VLAN based solution
  • verify the VLAN based solution was implemented properly using show and debug commands
  • Document results of VLAN implementation and verification

 

Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a Security solution
  • Create a implementation plan for the Security solution
  • Create a verification plan for the Security solution
  • Configure port security features
  • Configure general switch security features
  • Configure private VLANs Configure VACL and PACL
  • Verify the Security based solution was implemented properly using show and debug commands
  • Document results of Security implementation and verification

 

Implement Switch based Layer 3 services, given a network design and a set of requirements

  • Determine network resources needed for implementing a Switch based Layer 3 solution
  • Create an implementation plan for the Switch based Layer 3 solution
  • Create a verification plan for the Switch based Layer 3 solution
  • Configure routing interfaces Configure Layer 3 Security
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  • Document results of Switch based Layer 3 implementation and verification

 

Prepare infrastructure to support advanced services

  • Implement a Wireless Extension of a Layer 2 solution
  • Implement a VoIP support solution
  • Implement video support solution

 

Implement High Availability, given a network design and a set of requirements

  • Determine network resources needed for implementing High Availability on a network
  • Create a High Availability implementation plan
  • Create a High Availability verification plan
  • Implement first hop redundancy protocols
  • Implement switch supervisor redundancy
  • Verify High Availability solution was implemented properly using show and debug commands
  • Document results of High Availability implementation and verification

 

Maintain and monitor network performance

  • Develop a plan to monitor and manage a network
  • Perform network monitoring using IOS tools
  • Perform routine IOS device maintenance
  • Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer

 

Troubleshoot

  • Multi Protocol system networks
  • EIGRP
  • OSPF
  • eBGP
  • routing redistribution solution
  • a DHCP client and server solution
  • NAT
  • first hop redundancy protocols
  • IPv6 routing
  • IPv6 and IPv4 interoperability
  • switch-to-switch connectivity for the VLAN based solution
  • loop prevention for the VLAN based solution
  • Access Ports for the VLAN based solution
  • private VLANS
  • port security
  • general switch security
  • VACL and PACL
  • switch virtual interfaces (SVIs)
  • switch supervisor redundancy
  • switch support of advanced services (i.e., Wireless, VOIP and Video)
  • a VoIP support solution
  • a video support solution
  • Layer 3 Security
  • issues related to ACLs used to secure access to Cisco routers
  • configuration issues related to accessing the AAA server for authentication purposes
  • security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)

Our Facilities
Our instructors are highly skilled with industry experience of  many  years, working in a best and renowned organization. Our Trainers follow an approach to engage students during instruction and thus the training methods are modified as per the trainee’s needs which may include direct 1-1 discussions, group discussions, and etc.

Our Cisco lab involves a full course of action of to a great degree latest supplies sensible for setting up the likelihood for the Cisco CCNA and CCNP exams. In the event that it’s not all that much inconvenience visit our centre to see the workplaces and to discuss your essentials.
Also, you get many more advantages along with a highly professional approach.

• Flexible course timing to suit you
• Offer highly competitive course prices
• You will get Certificate of completion at the end of course
• We are centrally located and have good access from all corners of London.
• We offer  Hands-on training with lab access
• Small group training approach is followed, up to 5

CISCO - CCNP

Full Time 5 Days (09:00 - 17:00)

Weekend Batch 6 weekends (Sat 10:00 - 18:00)

Evening Batch 2 weeks (Mon-Fri 18:30 - 21:30)

Starts On:
January 16, 2017
9:00 AM
Ends On:
January 27, 2017
5:00 PM
Contact Support
Get a reply within a day

Any questions ?





    Input this code: captcha

    Related Courses

    SAP Training London is rated 5 stars on Facebook based on 3 reviews